Numbers first. Slides never.
In this demo's story, INTARA ran on Saengthong's three plants for a year. This page is the kind of result a custom build gets measured by — numbers, not promises.
฿12.4M
Downtime cost avoided
Rayong, 12 months — 14 failures caught before they stopped a line.
-37%
Scrap reduction
Moulding Hall 1, six months after Vision QC went live at the eject stations.
+9 pts
OEE improvement
Group average, first year. Honest counting found the losses first.
7 mo
Payback period
Median across the three Saengthong plants, hardware included.
The same dashboards you can click through in the console — with a year of story behind them.
Saengthong Rayong
Automotive stamping & body parts
Saengthong Chonburi
Precision injection moulding
Saengthong Lamphun
Beverage canning & filling
A custom platform earns its keep in numbers like these.
Downtime avoided, scrap reduced, honest OEE — these are the metrics a factory-intelligence build is judged on. Your machines, defect types and KPIs would replace Saengthong's; the discipline of measuring stays.
Shaped on the floor
Screens and alerts designed with the people who run the lines, not handed down.
Data stays yours
Edge-first: models run on-site, and your recipes never leave.
Measured from day one
A baseline before the build, so the after is provable — like this page.